WE ARE HORSES
Help
Join
Log in
Hästannons.sehastannons.se
ads
HorsesBreeding marketRidersEquipmentStable & feedDogBargainsHorse transportProperties & farmsServices
Explore
Contracts & purchase agreementsGuidesGiveawaysHorse welfareHorse insuranceGet Freja eIDBTB StudBookkeeping PremiumStable scheduleCourse builderOld Molly – BreedingBreedersHorse photographersEqu used – second hand
Stable profilesStable booksweden map
Create ad
Hästannons.se
Hästannons.sehastannons.se

Sweden's best digital place for horse life! Advertise for free — simple and secure.

Marketplace

  • Create ad
  • Buy a horse
  • Riders
  • Equipment
  • Stable & feed
  • Bargains
  • Brands
  • Horse services
  • Properties & farms

Information

  • Guides
  • Horse insurance
  • Secure deal with Hästannons
  • Get Freja eID
  • Giveaways
  • Horse welfare
  • Terms of use
  • Privacy policy
  • Delete account
  • Cookie policy

Hästannons.se

  • About us
  • Download the app
  • Advertise with us
  • Contact us

Follow us

  • Instagram
  • Facebook
Hämta Hästannons i App StoreLadda ned Hästannons på Google Play

© 2026 hastannons.se. All rights reserved

WeFlippedGroup.se

Cart

Your cart is empty

Browse the range and add products.

Browse ads →
Guides/Building a horse property
Swedish farmstead with red outbuildings and a farmhouse, set among green fields.
Guide · Building a horse property

Building a horse property

How to plan a horse property from the ground up: a considered layout, sensible movement between stable, paddocks and feed, planning permission and permits, plus a budget and timetable you can live with.

9 min read·Updated July 2026

Building a horse property from scratch is a rare chance to create a yard that is safe, efficient and a pleasure to run. It also demands careful planning. The decisions you take early — on siting, daily movement and permits — will shape everyday life for decades. Here is how to get the groundwork right.

Plan the whole site first

Draw the entire yard before you build a thing. Where will the stable, paddocks, feed store, manure pad, indoor school and access sit in relation to one another? A considered flow saves thousands of steps and hours every year, and makes the property safer.

Think about the flows
  • A short walk between stable, paddocks and feed store
  • A logical site for the manure pad — close to the stable, easy to empty
  • Safe, wide tracks and access for lorries and tractors
  • Siting that respects sun, wind, drainage and the view
  • Room to expand later

Planning permission and permits

Speak to the municipality early. Inside an area covered by a local development plan (detaljplan), a stable and an indoor school always need planning permission. Outside one, a building may be exempt as an agricultural building — but only if the horses truly belong to a farm. The courts take a narrow view: a standalone equine business, such as a training or livery yard, is not treated as agriculture in practice and still needs permission (see RÅ 2005:53 and RÅ 1999:57). Never assume the exemption applies — ask the municipality to assess your case.

Check in good time
  • Planning permission for the stable, indoor school and other buildings — or written confirmation of the agricultural-building exemption
  • Local development plan, shoreline protection and area regulations
  • Manure-storage rules (sealed pad, capacity by livestock numbers and region)
  • Water and sewage — mains or private
  • An electricity connection with enough capacity

Stable and buildings

Build the stable to Jordbruksverket (the Swedish Board of Agriculture) rules on box size, ceiling height and ventilation — then go beyond the minimum wherever you can. Think through the tack room, wash bay, feed room and laundry from day one; they are hard to add later.

  • Box sizes and ceiling height to Jordbruksverket rules — based on height at the withers
  • Good ventilation and plenty of daylight
  • Tack room, wash bay, feed and bedding stores
  • Fire-safe construction and well-planned escape routes
Vaulted stable aisle with white arched ceilings, rows of box doors and a wheelbarrow.

Land, paddocks and water

Drainage and fencing are two of the most important — and most easily underestimated — investments. Plan the paddocks for rotational grazing, take water and power to where you will need them, and hard-surface the spots that otherwise turn to mud at gates and feeding points.

  • Sound drainage on paddocks, tracks and gathering areas
  • Safe fencing suited to the horses
  • Water and electricity run out to paddocks and the outdoor arena
  • Hardstanding at gates and feeding points

Budget and timetable

Set a realistic budget with a margin for the unexpected, and gather quotes in good time. Build in phases if money demands it — but get the infrastructure (drainage, power, water) right from the start so later stages slot in easily.

Allow a margin

Building projects almost always overrun on both time and cost. Put a clear contingency in, prioritise what is hard to change later (ground, drainage, the structure) and be ready for the groundworks to throw up surprises.

Frequently asked questions

What should I plan first when I build a horse property?

The whole site and how you will move around it. Draw where the stable, paddocks, feed store, manure pad, indoor school and access will sit in relation to one another before you build anything. Thoughtful flows save work every day and make the yard safer — and that early plan shapes everyday life for decades.

Which permits do I need to build a horse property?

Inside a local development plan, a stable and an indoor school always need planning permission. Outside one, a building may be exempt as an agricultural building, but only if the horses belong to a farm — a standalone equine business usually still needs permission. You may also have to arrange manure storage, water and sewage, and check shoreline protection and electrical capacity. Contact the municipality early.

What is easiest to miss in the build?

Drainage and infrastructure. Poor drainage on paddocks, tracks and riding surfaces causes trouble for decades and is expensive to put right later. Run water and power to where you will need them from the start, and put hardstanding at gates and feeding points.

Can I build the horse property in stages?

Yes — it is common for financial reasons. The key is to get the infrastructure — drainage, power and water — right from the start so later phases connect easily. Plan the whole yard in advance even if you build it piece by piece.

Read on

Stables and box sizes—Indoor school and riding facility—Paddocks and pasture management